image
image

Waste Handling and Transportation

We handle all waste in a safe and efficient manner taking into consideration associated safety precautions. Wastes generated from locations are contained in closed skips. . Our skips are certified and always properly covered to avoid any secondary contamination on transit. The skips are loaded and offloaded using crane or forklift, in compliance to all safety regulations. Our crane/forklift operators are skilled, certified and have years of experience. Transportation is via Pre-mobbed, legally compliant and ‘fit for purpose’ vehicles (i.e. Low-bed Truck) with appropriate documentation and driven by fully trained operators.
Skips are decontaminated after each use by washing with degreasers. Water generated from the washing is managed at the waste treatment facility.
Prior to the incineration of waste, ENJ PROJECTS ensures the separation of the waste constituents using settling tanks that allows oil to float, with the heavy sludge and settable solids remaining at the bottom of the tank by gravity. Oil is partially recovered and the waste water are treated before discharge to the environment in compliance with regulators standard while the sludge is incinerated. The sludge and contaminated soil are incinerated at a temperature between 900 – 13000C. ENJ PROJECTS ensures the tracking and statutory documentations in respect to the waste and incinerator are prepared and always available.